Jump Main Menu. Go directly to the main content (Acces key S)

Tecnicas Reunidas Canada

Sección de utilidades

Fin de la sección de utilidades

You are in:

  1. Business Areas |
  2. Power

Tecnicas Reunidas CanadaPower

Start of main content

Since 1986, TR has undertaken more than 45 million hours of engineering, purchasing management, construction and startup, on projects with total installed power of more than 40,000 MW in more than 25 countries.

Through its Power division, TR provides its customers all kinds of industrial facility engineering and construction services, ranging from feasibility studies or basic and conceptual engineering, to the complete execution of large and complex turnkey products in the following activity areas:

With numerous project development references in the division’s areas of activity, our customers can be certain of the optimum use of our Know How, in-depth knowledge of technologies and turnkey project management skills, responding to customer requirements with the best quality, price and time of execution.

TR has supplied power projects to match the energy needs of a wide range of Clients (utilities, oil refiners, gas companies, chemical processes, automotive industries…etc). Each application has required the compliance with a different set of requirements and specifications and, therefore, each solution has been fit to purpose. The plants design and key equipment selection (turbine, boilers, steam generators…etc) is performed upon the highest power engineering standards, as well as CAPEX and OPEX optimization criteria for each project.

TR is a founding partner of Empresarios Agrupados, incorporated in 1971, which has played an important role as Architectural Engineering in the design and construction of power generation plants worldwide.

CO2 Research Projects

Aware of the importance of acquired commitments both on a domestic and international level in terms of CO2 emissions, as well as the responsibility of social agents in charge of the development of industrial activity, TR has initiated several activities, in order to identify designs that allow thermal generation under conditions that are compatible with CO2 emission mitigation scenarios, applying the broad experience of TR in gas capturing and separation processes in industrial plants.

TR has participated as partner in various research programmes, such as the “CENIT CO2” project or in the Singular Strategic Project "Advanced CO2 generation, capture and storage projects”, headed by CIEMAT. Today, TR is developing the engineering and FEED (Front End Engineering Design) of the OXY CFB 300 plant; a project supported with 180 million from the European Commission (EC).

End of main content